Description
The Public Works Supervisor in Illium has asked you to reset the power system under Illium.
Objectives
1. Reset the Power Shunts in the Illium Public Works Tunnels
2. Reset the Power Capacitor under Illium in the Public Works Tunnels
Completion
Report to the Public Works Supervisor in Illium
Reward
- 999 Copper
- Unknown The Dominion Reputation Points
Quick Facts
Faction: Dominion
Level: 15
Required Level: 10
Difficulty:
Zone: Illium
Category: Daily Quests